Home
/
Media
/
The geyser
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Sign In
Home
About BPC
Vision and Mission
Our Board Members
Executive Management
Products & Services
Social Responsibility
Annual Reports
Environment
SHER Policy
FAQ
BPC Act
Customer Service
MyAccount@BPC
Online Services
Individual Application For Supply Of Electricity
Change of Contact Details
Business Application For Supply Of Electricity
Discontinuation of Electricity Supply
Report a Fault
Submit a Complaint
Submit Meter Reading
Technical Services
Cable Route Identification
Generator Connection and Commissioning
New Developments that Encroache on BPC Servitude
Pressure Testing and Fault Locating Services
Relocating of BPC Infrastructure
Shutdown requests
Shutdown requests by customers
Shutdown requests by Registered Consultants
Vegetation Management on BPC Infrastructure
Payment Methods
BPC Vendors
Tariffs
Demand side management
Careers
Tenders
SRDS Document
Tender Listings
Media
News
Announcements
Brochures
Educational Info
Energy Saving Tips
Lighting
Ironing
Geyser
Refrigerator
Safety Tips
Videos
Projects
Contact Us
About BPC
Vision and Mission
Our Board Members
Executive Management
Products & Services
Social Responsibility
Annual Reports
Environment
SHER Policy
FAQ
BPC Act
Customer Service
Online Services
Individual Application For Supply Of Electricity
Change of Contact Details
Business Application For Supply Of Electricity
Discontinuation of Electricity Supply
Report a Fault
Submit a Complaint
Submit Meter Reading
Technical Services
Cable Route Identification
Generator Connection and Commissioning
New Developments that Encroache on BPC Servitude
Pressure Testing and Fault Locating Services
Relocating of BPC Infrastructure
Shutdown requests
Shutdown requests by customers
Shutdown requests by Registered Consultants
Vegetation Management on BPC Infrastructure
Payment Methods
BPC Vendors
Tariffs
Demand side management
Careers
Tenders
SRDS Document
Tender Listings
Media
News
Announcements
Brochures
Educational Info
Energy Saving Tips
Lighting
Ironing
Geyser
Refrigerator
Safety Tips
Videos
Projects
Contact Us
The geyser
Page Content
Always install your hot water system in accordance with the manufacturer’s instructions.
Pay special attention to the size of hot water pipes and the installation of the first 1.5 to 2 metres of hot water pipe nearest to the geyser.
Locate your hot water system close to points of most frequent use like the kitchen and the bathroom.
A hot water tap that leaks one drop per second for a month adds up to 800 litres of water that you cannot use yet paid for in heating cost.
Normally, you use less hot water for a shower than a bath.
Get the family into the habit of plugging the water basin when washing or shaving. Allowing hot water to pour out of the taps and down the drain is wasteful and ex-pensive.
Do not set the thermostat too high. A setting of 50°C (122°F) to 60°C (140°F) is recommended.