Q1. What is BPC’s Rooftop Solar Programme?
The Rooftop Solar (RTS) Programme allows eligible BPC customers to install solar photovoltaic (PV) systems to generate electricity for their own consumption and export excess electricity to BPC, subject to programme requirements and available capacity.
Q2. Who qualifies for the Rooftop Solar Programme?
The programme is open to eligible BPC domestic, commercial and industrial customers who meet the prescribed technical and regulatory requirements.
Q3. Can I install solar panels and remain connected to the BPC electricity grid?
Yes. The programme allows customers to install grid-connected solar systems while remaining connected to the BPC network. This enables customers to use solar-generated electricity and draw electricity from the grid when their solar generation is insufficient.
Q4. Can I sell excess electricity generated by my solar system to BPC?
Yes. Under the Rooftop Solar Programme, eligible customers can export surplus electricity to BPC in accordance with the applicable programme arrangements and approved metering provisions.
Q5. What is the maximum solar installation capacity permitted under the programme?
The current programme eligibility limits are:
- Domestic customers: Up to 35 kW, with a maximum allocation of 13.8 kW for single-phase connections and 35 kW for three-phase connections.
- Commercial and Industrial customers: Up to 1 MW, subject to the system size not exceeding 110% of the customer’s electricity consumption over the preceding 12 months.
These limits are also subject to the programme’s overall capacity allocation and applicable approvals.
Q6. Can I install solar panels without notifying BPC?
No. Customers intending to participate in the grid-connected Rooftop Solar Programme must apply to BPC and obtain the necessary approvals before installation and connection to the grid. This ensures compliance with technical, safety and grid-integration requirements. Applications are done through the BPC website www.bpc.bw
Â
Q7. Do I need a qualified installer to install my rooftop solar system?
Yes. Solar installations must be undertaken by appropriately certified and qualified technical personnel to ensure that the system meets the required safety and technical standards.
Q8. Will installing solar panels eliminate my BPC electricity bill?
Not necessarily. Your electricity bill will depend on your consumption, the amount of electricity generated by your solar system, and the electricity drawn from the BPC network. Customers should also consider applicable charges and programme arrangements.
Q9. Does installing solar panels mean I will have electricity during a BPC power outage?
Not necessarily. A standard grid-tied solar system without battery storage or an appropriately configured backup system will generally shut down during a grid outage for safety reasons. Customers who require backup electricity should consider an approved system with suitable battery storage and changeover arrangements.
Q10. How do I apply for the Rooftop Solar Programme?
According to BPC’s Rooftop Solar Programme application requirements and the BERA guidelines, the documentation differs slightly between domestic and commercial/industrial (C&I) applicants. Customers can access the Rooftop Solar application information and requirements through the BPC website at www.bpc.bw
Here is a practical checklist for both categories.
Domestic customers (individual applications) Individual / Residential, you will need:
- Valid identification document: Certified or valid copy of Omang or passport.
- Proof of property ownership or occupancy: Title deed or lease agreement for the property where the solar system will be installed.
- BPC customer details: Your BPC account or meter details.
- If you are not the registered BPC customer:
- You must additionally provide:
- Identification documents for both the tenant/applicant and landlord or meter owner, as applicable.
- A letter of authorisation from the registered meter owner.
- Commercial and industrial customers, Business / Corporate: Companies will need to provide:
- Certificate of Incorporation: Proof of company registration.
- Directors’ consent: Formal consent from the company’s director(s) authorising the solar installation and application.
- Directors’ identification: Valid Omang or passport copies for the directors.
- Share Certificate: Documentation confirming the company’s shareholding.
- BPC customer details: Company electricity account or meter details.
- If the company is not the registered BPC customer:
- A letter of authorisation from the registered meter owner must also be submitted.
Â
How to apply
The application is submitted online (www.bpc.bw)
Access Rooftop Solar Application : Application process
- Complete the online eligibility assessment and application form.
- Upload the required supporting documents.
- BPC assesses the application and available network capacity.
- Upon approval, obtain the conditional Interconnection Agreement (ICA).
- Engage an appropriately licensed or certified technical professional to install the system.
- Arrange system inspection, certification and final approval before operating the installation.
For systems above 100 kW, the application is also referred to BERA for licensing and approval.
Important points customers should know
- Do not install or connect a grid-tied solar system before obtaining the required BPC approval.
- The system must be designed and installed by appropriately qualified and certified technical personnel.
- Excess electricity exported to BPC is credited in accordance with the programme’s net-metering arrangements.
- The programme permits both roof-mounted and ground-mounted systems, subject to the applicable requirements.